Transition manager (QR8156)

Transition manager (QR8156)


Intern

02/03/2021


  • Omschrijving

    Functie: Transition manager (QR8156)
    Start: 1-4-2021, 36 uur per week
    Periode: 6 mnd+
    Omgeving: Amsterdam

    Omschrijving:
    IT RMM Entity-based Controls
    - Delivering and collecting evidence
    *Entity-related controls evidence preparation is divided between WPS risk guild members which Transition manager will be a part of. Each member is responsible for two controls per quarter.
    - Evidence quality check
    - Uploading memos with evidence in ITRMP
    - Supported by WPS PMO
    - Archiving evidence in dedicated repository
    - Supported by WPS PMO
    - Evidence quality assessment

    IT RMM Asset-based Controls
    - Collecting evidence
    IT RMM Asset-based Controls in scope:
    - Foundation controls
    - Platform Security controls
    - Change management controls
    - Operational resilience controls
    - Security Monitoring controls
    - Cybercrime resilience controls
    Excluding User Access Management control
    - Evidence quality check
    - Uploading memos with evidence in ITRMP
    - Supported by WPS PMO
    - Archiving evidence in dedicated repository
    - Supported by WPS PMO
    - Performing Key Control Testing (KCT) - Change management control
    - Evidence quality assessment

    General Activities
    - Reporting risk score to the Asset Owner for assets described in Appendix 5.2
    - Alignment with Business Partner's 2LoD
    - Follow-up on findings encountered during evidence collecting and evaluation
    Follow-up actions – examples:
    - Cmdb and related tooling inconsistencies correction
    - DRA findings and Black Hat findings
    - SOLL-IST findings
    - Vulnerability scope findings
    - Patching - code Reds & Code Yellows
    - Outstanding security incidents
    - Outstanding security analytics findings
    - DDOS test findings
    - Initiating corrective and preventive actions
    Examples:
    - facilitating pen tests scheduling
    - Alignment with DR planning
    - monitoring LCM calendar
    - Contribute to RMM-related documents creation
    Examples:
    - MIAs
    - Closure memos
    - Risk Acceptance
    - Registering assets and changing asset-related parameters/relations in the cmdb
    - Maintaining/updating LCM calendar in the cmdb

    Extra informatie:
    Qualogy streeft ernaar om iedere kandidaat binnen 5 werkdagen een persoonlijke reactie te sturen.
    Indien de klant een security screening vereist zijn de (eenmalige) kosten hiervan voor eigen rekening.

  • Omschrijving Freelancer

  • Gebruikersnaam

    U dient in te loggen om gebruik te maken van Opdrachten.nl

  • Opdrachtrubriek

    ICT (netwerken en systemen)

  • Locatie Opdracht

    Amsterdam

  • Provincie

    Noord-Holland

  • Bijlagen

  • Gewenste Reacties

    Bedrag per uur

  • Verspreiden via social media